Special and Docking Survey of m/v ALMERIA
26 Feb 2021
On 26 February 2021 m/v ALMERIA passed the Special and Docking Survey at PaxOcean Engineering Zhoushan Shipyard with installation of Ballast Water Treatment System.
In addition, a safe muster point in the steering gear room was modified based on the industry assessment of piracy activities and guidance on the construction and use of citadels.
Upon completion of the 2nd Special Survey and Dry-Docking repair m/v ALMERIA is in full compliance with all required International Conventions and Class BV requirements.